Why this project matters
This project will supply drinking water to the inhabitants of Iboua village (Tisgharine and Tabouhadout hamlets), about 1,300 people, as well as their livestock. Water will be distributed through individual connections. The expected benefits are immediate: better health, and considerable time saved for women and children who usually fetch water.
Location
- Iboua village (Tisgharine and Tabouhadout hamlets)
- Laanaceur municipality, Sefrou province, Fès-Meknès region
- Coordinates: 33.669601, -4.885006
Scope
- Drilling a well to an estimated depth of 170 to 200 m;
- 100 m of solid casing;
- submersible pump and accessories;
- solar panel installation;
- delivery pipe to the water tower, about 150 m.
The 30 m³ water tower is funded by the municipality, which also covers the distribution network to the houses.
Funding requirements
| Item | Unit | Unit price (MAD) | Quantity | Subtotal (MAD) |
|---|---|---|---|---|
| 170 to 200 m borehole, casing included | m | 600 | 180 | 108,000 |
| 15 HP submersible pump and accessories | unit | 18,000 | 1 | 18,000 |
| 3-inch UPVC delivery pipe, 16 bar | m | 400 | 180 | 72,000 |
| Pumping room with metal door (2 m × 1 m) | lump sum | 15,000 | ||
| Solar panels, protection cabinet, drive and structure | set | 86,000 | 1 | 86,000 |
| 16 bar delivery pipe to the water tower | m | 50 | 150 | 7,500 |
| Total to be funded | 268,500 |
As the water tower (MAD 160,000) is funded by Laanaceur municipality, the funding requirement is MAD 268,500 (about EUR 25,000).
How to support this project
The project is studied, costed and backed by the municipality. It can be funded in full or in work packages (drilling, solar pumping, supply line). We provide partners with site monitoring and an impact report.